Bond Offering Memorandum 23 July 2014 - page 322

Kuwait Energy
EL-12-211107
59
FIGURE 5.1
LOCATION OF JHERRUCK BLOCK, PAKISTAN
The first well on the Block, Jherruck B-1, was drilled in 2011 to a total depth of 9,186 ft
(2,800 m) on the “Prospect B” structure. Gas was identified on the logs in three sands in
the Lower Goru Formation, referred to as A, B and C. The A sand at a depth of 8,644 ft
(2,330 m) and the C sand at a depth of about 8,465 ft (2,580 m) were perforated and
tested, and also treated with acid. However, the maximum flow rate achieved was only
about 0.4 MMscfd, which is non-commercial, so the well was plugged and suspended.
1...,312,313,314,315,316,317,318,319,320,321 323,324,325,326,327,328,329,330,331,332,...567
Powered by FlippingBook