Previous Page  20 / 31 Next Page
Basic version Information
Show Menu
Previous Page 20 / 31 Next Page
Page Background

Abu Sennan & Burg El Arab (BEA)

Abu Sennan

Burg El Arab (BEA)

Source: Company filing.

(1) Farm-out completion subject to pre-emption rights and government approvals. (2) Represents WI production pre-farm out of the 25% stake to Global Connect.

Onshore block located in the Alamein Basin in the

Western Desert

Producing from the Abu Roash & Bahariya formations

through 15 wells

100% WI with average production of 1.4 kboe/d in

2016

Concession expiry in December 2021

Ongoing drilling and work over program to support

production level

Located in the Abu Gharadig Basin in the Western

Desert

25% revenue WI/53% cost WI, post the farm-out of 25%

WI to Global Connect announced in 2017

(1)

Average WI production of 1.9 kboe/d

(2)

in 2016 from 5

fields

Operational focus on increasing production levels

through development drilling, appraisal and exploration

activities

Burg El Arab

Oil Field

Abu Sennan-1

Al Ahmadi

Abu Sennan-2

Abu Sennan-3

ASH

Al Jahraa

ZZ

ASA

El Salmiya

Oil Field

Gas Field

20