6
Development
The main development activities during Q3 2015 included the drilling of 17 development wells, 12 in Oman, 4 in Egypt and 1 in
Iraq. The table below provides the status of the development wells at the end of Q3 2015:
Country
Basin/Area Well name
No. of
Wells
Cost Interest
Status at end Q3 2015
Q4 2014 Carry-over wells
Iraq
Siba
Siba-4
1
60%
Initial rate ~6000 bcpd @ 64/64’ choke, 28 MMScf/d
after acid job.
Egypt
Abu
Sennan
Al Jahraa-4
1
78%
Initial rate 1,373 bopd, 1.1 MMscf/d, production
restricted down to 622 bopd , 0.4 MMscf/d; maximum
rate 1,561 bopd, 1.4 MMscf/d (lifted with nitrogen);
current rate (Al Jahraa-04 long string) 151 bopd on
128/64’’ choke size, Al Jahraa-4 short string 513 bopd
on 64/64’’ choke size.
Oman
Karim
Small
Fields
Ilham-P14, SMP-103
2
15%
On production.
Q1 2015
Iraq
Siba
Siba-5
1
60%
Canceled the drilling (weak foundation).
Oman
Karim
Small
Fields
Various
10
15%
On production.
Q2 2015
Egypt
Abu
Sennan
ASA-3
1
78%
Initial rate 588 bopd, 0.21 MMscf/d, production
restricted down to 513 bopd , 0.05 MMscf/d;
maximum rate 1,047 bopd, 0.18 MMscf/d; current
rate 345 bopd, 0.05 MMscfpd on 128/64’’ choke size.
Oman
Karim
Small
Fields
Various
11
15%
On production.
Q3 2015
Iraq
Siba
Siba-6
1
60%
Drilling.
Egypt
Area A
Yusr-63
1
70%
Initial rate 44 bopd, high watercut.
SHNW-11
1
70%
Initial rate 470 bopd, 0.4 MMscf/d, production
increased to actual 589 bopd, 0.39 MMscf/d on
64/64’’ choke size, current rate 521 bopd, 0.4
MMscfpd on 64/64’’ choke size.
BEA
BEA NW-2
1
100%
Initial rate 156 bopd, production increase to 254 bopd,
0.01 MMscf on 128/64’’ choke size, current rate 238
bopd.
BEA-19
1
100%
Drilling.
Oman
Karim
Small
Fields
Various
12
15%
10 on production & 2 drilling.
Total wells spud
(2015)
44