Kuwait Energy’s daily average WI share of production for Q4 2015 compared to Q3 2015 and Q4 2014

per asset is shown in

the table below (in boepd):

Q4 2015

Q3 2015

% Change

Q4 2015

Q4 2014

% Change

BEA

1,695

1,441

17.6%

1,695

1,516

11.8%

Abu Sennan

3,029

3,439

-11.9%

3,029

1,097

176.1%

Area A

4,615

4,557

1.3%

4,615

4,516

2.2%

ERQ

11,111

11,600

-4.2%

11,111

12,255

-9.3%

Egypt Total

20,450

21,036

-2.8%

20,450

19,383

5.5%

Block 9

2,177

0

--

2,177

0

--

Iraq Total

2,177

0

--

2,177

0

--

Oman Total

2,567

2,486

3.3%

2,567

2,581

-0.5%

Block 5

0

0

--

0

379

-100.0%

Block 43

0

0

--

0

4,437

-100.0%

Yemen Total

0

0

--

0

4,816

-100.0%

Production Total

25,194

23,522

7.1%

25,194

26,780

-5.9%

Exploration

The ZZ-5X oil exploration well, located approximately nine kilometres to the west of the El Salmiya Field, discovered

hydrocarbons in the primary Abu Roash Formation. Testing over three intervals, totalling 14 metres in the Abu Roash

Formation, was conducted and trace hydrocarbons were recovered. The well has subsequently been temporarily suspended to

study the possible stimulation options and the rig released. The following table summarizes the exploration drilling activities

for 2015:

Country

Basin/ Area

Well Name

Cost

Interest

Well Status at end Q4 2015

2014 Carry-over wells

Egypt

Abu Sennan

ASH-1X

78%

Tested successfully Alam Albuieb reservoir with

rates 2,755 bopd and 2.7 MMscf of gas on 64’’

choke; current

rate 148 bopd.

Iraq

Block 9

Faihaa-1

60%

Mishrif ~3,600 bopd at 64/64’’ choke, Yamama

~8800 bopd at 64/64” choke

,

daily rate increase to

6,600 bopd at 44/64’’ choke. Faihaa-1 put on fast

track production facilities by trucking the produced

oil with an average rate of 5000 bopd at SOC depot.

Q1 2015

Egypt

Area A

EY-3X

70%

Dry hole.

Q2 & Q3 2015

No Exploration wells spud.

Q4 2015

Egypt

Abu Sennan

ZZ-5X

78%

Well temporarily suspended to study possible

simulation options and the rig released.

Total (2015 wells spud)

2